3000m³ vegetables waste biogas tank for producing biogas
Advantage of Glass-Fused-to-Steel Tanks
• Short erection period, cost-effective tank solution
• Excellent corrosion resistance, longevity more than 30 years
• Easy to install, without large installation equipment and/or very skilled labors
• Tank volume can be easily expanded, dismantled, removed and relocated
• Elegant appearance, tank color can be customized
• Ideally suited for almost all climates with extreme weather conditions
Specification
Weight | 25 kg |
---|---|
Dimensions | 0.45 × 0.45 × 0.4 cm |
Model | ECT-3000 |
Kind of waste | various kinds of vegetables waste from market or another organic waste |
Hydraulic Retention Time(HRT): | 25days |
Total Amount Waste: | 60-85tons |
Fermentation Temperature | 30℃ |
Daily Diogas Output: | 2500-35000m³ |
Size of Biogas Reactor: | Φ19.11*10.2m |
Original price was: $35,000.00.$34,500.00Current price is: $34,500.00.

Product Detail
The solution
WLY is the largest provider of Industrial storage tanks, silos and aluminum dome covers, all designed to meet your unique application. .
Accent Heading
How long time to install?
The construction period is short, more than twice faster than the speed of the traditional one.
How is perfromance in cold weather?
Superior anticorrosion performance,Adaptable, it can be in the cold weather construction.
How is the cost of it compared with RC tank ?
It can be relocated, expanded and recycled.Low cost and reasonable price..

How to get the right one plan for your project ?
Technical proposal
Provide technical proposal,projeck proposal,funding applications,feasibility studies,industry policy research and lab analysis.
Engineer Deisign
Provide complete engineering design from preliminary engineering design.to construction drawing design.
Equipment Supply
WLY biogas produing factory will produced you customized whole biogas system with technical guiding drawings and users' manual for installing and operating.
Construction &Installation
Lorem Ipsum has been the industry's standard dummy text ever since the 1500s,
Engineering Guiding
Our Einginner with technical team will guide you to check all the system and make sure the right installation for operataing and do the first test.
Operation Service
Our professional technical team will teach your skillers to operat the whole system and do the maintenace if any problems occoured during use time.
Harvesting
Normally,you can get the refund from your biogas project after 2 months by generating electicity or producing organic fertilizer.